nLighten Paris PAR2
nLighten Paris PAR2 is an operational data center operated by nLighten HQ in Aubervilliers, France. Our footprint estimate of its power is about 2.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | nLighten HQ |
| Facility power | 2.4 MW (range 1.2 MW to 3.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,999 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 10 networks PeeringDB. |
| Address | 34 rue des Gardinoux |
| Coordinates | 48.90673, 2.36783 |
| Website | nlighten.com/en/france-data-centers/paris-2 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 225 kV, 500 m away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 68 |
| Power plants within 50 km | 2.2 GW in 53 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does nLighten Paris PAR2 use?
We estimate the facility power at about 2.4 MW. Estimate from building footprint, low confidence.
How close is nLighten Paris PAR2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (225 kV), about 500 m away.
How clean is the power for nLighten Paris PAR2?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates nLighten Paris PAR2?
nLighten HQ.
Data centers near Aubervilliers
- Digital Realty Paris PAR2 189 m · 15 MW
- Equinix PA5 - Paris, Victor Hugo 313 m · 3 MW
- Digital Realty Paris PAR5 361 m · 2.6 MW
- Equinix PA6 - Paris, Condorcet 393 m · 9.2 MW
- Digital Realty Paris PAR1 531 m
- MCI/Verizon Paris St Denis 594 m
- Digital Realty Paris PAR3 973 m · 4 MW
- Orange - Aubervilliers 2.0 km · 15 MW
More nLighten HQ data centers
- nLighten Swindon BRS2 United Kingdom
- nLighten Leeds LBA1 United Kingdom
- nLighten Strasbourg SXB1 France
- nLighten Besancon MLH1 France
- nLighten Liverpool LPL1 United Kingdom
- nLighten Sophia Antipolis NCE1 France
- nLighten Paris PAR1 France
- nLighten Paris PAR3 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.