nLighten Besancon MLH1
nLighten Besancon MLH1 is an operational data center operated by nLighten HQ in Besançon, France. Our footprint estimate of its power is about 2.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | nLighten HQ |
| Facility power | 2.6 MW (range 1.3 MW to 4.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,187 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 14 networks PeeringDB. |
| Address | 2, rue Albert Einstein |
| Opened | 2012 |
| Coordinates | 47.22588, 5.97370 |
| Website | nlighten.com/fr/france-centres-de-donnees/besancon |
Power and grid
| Nearest high-voltage substation | Sous-station des Quatrouillots, 225 kV, 5.3 km away (SNCF Réseau) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 258 MW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.6 °C (2001 to 2025) |
| Cooling degree days | 95 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.43 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does nLighten Besancon MLH1 use?
We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.
How close is nLighten Besancon MLH1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Sous-station des Quatrouillots (225 kV), about 5.3 km away.
How clean is the power for nLighten Besancon MLH1?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates nLighten Besancon MLH1?
nLighten HQ.
Data centers near Besançon
- NetaPOP Pontarlier 45.3 km
- Haute-Saône Numérique 46.0 km
- Euro-Information EIP (Data Center) 66.6 km
- DTiX 68.8 km
- Centre de Calcul de l’Université de Bourgogne 68.8 km · 0.5 MW
- Bouygues Telecom 71.3 km · 8.9 MW
- SFR data center in Dijon 71.5 km · 1.5 MW
- Bouygues Télécom data center in Dijon 71.5 km · 0.8 MW
More nLighten HQ data centers
- nLighten Swindon BRS2 United Kingdom
- nLighten Leeds LBA1 United Kingdom
- nLighten Strasbourg SXB1 France
- nLighten Liverpool LPL1 United Kingdom
- nLighten Paris PAR2 France
- nLighten Sophia Antipolis NCE1 France
- nLighten Paris PAR1 France
- nLighten Paris PAR3 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.