Centre de Calcul de l’Université de Bourgogne
Centre de Calcul de l’Université de Bourgogne is an operational data center in Dijon, France. Our footprint estimate of its power is about 0.5 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.5 MW (range 0.3 MW to 0.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 424 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 210 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rue Recteur Marcel Bouchard 8 A, 21000, Dijon |
| Coordinates | 47.31492, 5.07089 |
| Website | ccub.u-bourgogne.fr/dnum-ccub |
Power and grid
| Nearest high-voltage substation | Poste électrique de Champs-Regnaud, 225 kV, 4.3 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 317 MW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39 °C (2001 to 2025) |
| Cooling degree days | 128 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.42 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centre de Calcul de l’Université de Bourgogne use?
We estimate the facility power at about 0.5 MW. Estimate from building footprint, low confidence.
How close is Centre de Calcul de l’Université de Bourgogne to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Champs-Regnaud (225 kV), about 4.3 km away.
How clean is the power for Centre de Calcul de l’Université de Bourgogne?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Data centers near Dijon
- DTiX 2.8 km
- Cogent Dijon 3.1 km · 3.1 MW
- Euro-Information EIP (Data Center) 3.3 km
- Bouygues Telecom 3.5 km · 8.9 MW
- SFR data center in Dijon 3.7 km · 1.5 MW
- Bouygues Télécom data center in Dijon 3.8 km · 0.8 MW
- nLighten Besancon MLH1 68.8 km · 2.6 MW
Sources
Correct this page or get the data