Bouygues Télécom data center in Dijon
Bouygues Télécom data center in Dijon is an operational data center operated by Bouygues Télécom in Dijon, France. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bouygues Télécom |
| Facility power | 0.8 MW (range 0.4 MW to 1.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 681 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 47.29398, 5.03121 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Couchey, 225 kV, 5 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 321 MW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39 °C (2001 to 2025) |
| Cooling degree days | 128 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.42 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bouygues Télécom data center in Dijon use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
How close is Bouygues Télécom data center in Dijon to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Couchey (225 kV), about 5 km away.
How clean is the power for Bouygues Télécom data center in Dijon?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Bouygues Télécom data center in Dijon?
Bouygues Télécom.
Data centers near Dijon
- SFR data center in Dijon 139 m · 1.5 MW
- Bouygues Telecom 313 m · 8.9 MW
- Cogent Dijon 1.7 km · 3.1 MW
- Centre de Calcul de l’Université de Bourgogne 3.8 km · 0.5 MW
- DTiX 6.2 km
- Euro-Information EIP (Data Center) 7.1 km
- nLighten Besancon MLH1 71.5 km · 2.6 MW
More Bouygues Télécom data centers
- Datacenter Bouygues Télécom France
- Datacenter Bouygues Télécom France
- Bouygues Telecom data center in Cabriès France
- Bouygues Télécom data center in Montpellier France
- Bouygues Télécom data center in Poitiers France
- Bouygues Télécom data center in Toulouse France
- Bouygues Télécom data center in Léognan France
- Bouygues Télécom data center in Nanterre France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.