nLighten Leeds LBA1
nLighten Leeds LBA1 is an operational data center operated by nLighten HQ in Normanton, United Kingdom. Our footprint estimate of its power is about 5.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | nLighten HQ |
| Facility power | 5.7 MW (range 2.8 MW to 9.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,715 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | nLighten Leeds |
| Address | White Rose Technology Centre, Don Pedro Ave, Normanton Industrial Estate |
| Coordinates | 53.69931, -1.39767 |
| Website | nlighten.com/en/united-kingdom-data-centers/leeds |
Power and grid
| Nearest high-voltage substation | Featherstone Substation, 132 kV, 1.7 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 7.3 km away |
| HV substations within 10 km | 19 |
| Power plants within 50 km | 7.3 GW in 62 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31.3 °C (2001 to 2025) |
| Cooling degree days | 14 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.73 kWh per m² per day |
| Wind at 50 m | 7.3 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does nLighten Leeds LBA1 use?
We estimate the facility power at about 5.7 MW. Estimate from building footprint, low confidence.
How close is nLighten Leeds LBA1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Featherstone Substation (132 kV), about 1.7 km away.
How clean is the power for nLighten Leeds LBA1?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates nLighten Leeds LBA1?
nLighten HQ.
Data centers near Normanton
- HSBC Wakefield Data Centre 1.4 km · 17 MW
- aql DC5 13.6 km
- aql DC2 14.1 km
- DC14-Leeds 14.8 km
- GridJet 14.8 km · 1 MW
- Templus DC Leeds LEE01 15.1 km
- Pulsant Rotherham YH-1 22.5 km
- HSBC Data Centre 24.2 km · 13 MW
More nLighten HQ data centers
- nLighten Swindon BRS2 United Kingdom
- nLighten Strasbourg SXB1 France
- nLighten Besancon MLH1 France
- nLighten Liverpool LPL1 United Kingdom
- nLighten Paris PAR2 France
- nLighten Sophia Antipolis NCE1 France
- nLighten Paris PAR1 France
- nLighten Paris PAR3 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.