LEDC - ABX1 - Albury

LEDC - ABX1 - Albury is an operational data center operated by Leading Edge Data Centres in East Albury, Australia. Our footprint estimate of its power is about 0.5 MW.

Key facts

StatusOperational
OperatorLeading Edge Data Centres
Facility power0.5 MW (range 0.3 MW to 0.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 442 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 210 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressAvalon Street 17, 2640
Coordinates-36.07126, 146.95522

Power and grid

Nearest high-voltage substationJelbart ZS, 132 kV, 1.7 km away (Essential Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWodonga Terminal Station, 330 kV, 9.3 km away
HV substations within 10 km5
Power plants within 50 km808 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature15.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.1 °C (2001 to 2025)
Cooling degree days688 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.04 kWh per m² per day
Wind at 50 m4.2 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does LEDC - ABX1 - Albury use?

We estimate the facility power at about 0.5 MW. Estimate from building footprint, low confidence.

How close is LEDC - ABX1 - Albury to the power grid?

The nearest high-voltage substation in OpenStreetMap is Jelbart ZS (132 kV), about 1.7 km away.

How clean is the power for LEDC - ABX1 - Albury?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates LEDC - ABX1 - Albury?

Leading Edge Data Centres.

Data centers near East Albury

More Leading Edge Data Centres data centers