LEDC - DBO1 - Dubbo
LEDC - DBO1 - Dubbo is an operational data center operated by Leading Edge Data Centres in Dubbo, Australia. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Leading Edge Data Centres |
| Facility power | 0.6 MW (range 0.3 MW to 0.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 470 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks PeeringDB. |
| Address | 15 Jannali Road |
| Coordinates | -32.24104, 148.58202 |
| Website | leadingedgedc.com |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does LEDC - DBO1 - Dubbo use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
How clean is the power for LEDC - DBO1 - Dubbo?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates LEDC - DBO1 - Dubbo?
Leading Edge Data Centres.
More Leading Edge Data Centres data centers
- LEDC - ABX1 - Albury Australia
- LEDC - CFS1 - Coffs Harbour Australia
- LEDC - NTL1 - Newcastle Australia
- LEDC - TMW1 - Tamworth Australia
- LEDC - WGA1 - Wagga Wagga Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.