Leonardo (supercomputer)
Leonardo (supercomputer) is an operational data center operated by CINECA in Casalecchio di Reno, Italy. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | CINECA |
| Coordinates | 44.48633, 11.25978 |
Power and grid
| Nearest high-voltage substation | Morazzo, 132 kV, 1.4 km away (e-distribuzione S.p.A.) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Martignone, 380 kV, 8.8 km away |
| HV substations within 10 km | 19 |
| Power plants within 50 km | 1.3 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 14.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.8 °C (2001 to 2025) |
| Cooling degree days | 743 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.94 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Emilia-Romagna) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Leonardo (supercomputer) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Morazzo (132 kV), about 1.4 km away.
How clean is the power for Leonardo (supercomputer)?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates Leonardo (supercomputer)?
CINECA.
Data centers near Casalecchio di Reno
- Cineca Marconi-100 6.8 km · 2.6 MW
- EuroHPC Leonardo 7.4 km · 13 MW
- BOIX 8.6 km
- Data center in Bologna 8.8 km · 2.5 MW
- Ehiweb.it Bologna 8.8 km
- ECMWF data center in Bologna 8.8 km · 27 MW
- Data center Unipol Pilastro 10.7 km · 2.9 MW
- Noovle 11.7 km
More CINECA data centers
- Cineca Marconi-100 Italy
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.