Noovle is an operational data center operated by TIM in San Lazzaro, Italy. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | TIM |
| Coordinates | 44.49976, 11.40648 |
Power and grid
| Nearest high-voltage substation | San Donato, 132 kV, 1.8 km away (e-distribuzione S.p.A.) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Colunga, 380 kV, 4.7 km away |
| HV substations within 10 km | 20 |
| Power plants within 50 km | 960 MW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 14.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.8 °C (2001 to 2025) |
| Cooling degree days | 743 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.94 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Emilia-Romagna) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Noovle to the power grid?
The nearest high-voltage substation in OpenStreetMap is San Donato (132 kV), about 1.8 km away.
How clean is the power for Noovle?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates Noovle?
TIM.
Data centers near San Lazzaro
- Data center Unipol Pilastro 1.6 km · 2.9 MW
- BOIX 3.5 km
- Data center in Bologna 4.2 km · 2.5 MW
- ECMWF data center in Bologna 4.3 km · 27 MW
- Cineca Marconi-100 4.9 km · 2.6 MW
- Ehiweb.it Bologna 5.4 km
- EuroHPC Leonardo 5.9 km · 13 MW
- Leonardo (supercomputer) 11.7 km
More TIM data centers
- TIER IV Italy
- Centrale TIM Trento Nord Italy
- TIM data center in Voghera Italy
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.