TIER IV
TIER IV is an operational data center operated by TIM in Roma, Italy. Our footprint estimate of its power is about 87 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TIM |
| Facility power | 87 MW (range 44 MW to 139 MW) Estimate from building footprint, low confidence. Footprint estimate: about 72,594 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 37,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Via di Macchia Palocco 223, 00125, Roma |
| Coordinates | 41.76454, 12.34445 |
Power and grid
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 16 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 805 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.25 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (Lazio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TIER IV use?
We estimate the facility power at about 87 MW. Estimate from building footprint, low confidence.
How clean is the power for TIER IV?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates TIER IV?
TIM.
Data centers near Roma
- DC Noovle ROMA 328 m
- Fiber 23 3.3 km
- Unidata IDC-GALERIA 4.8 km
- Digital Realty ROM1 - Rome 12.1 km
- Data center Roma Capitale 12.8 km
- Retelit S.p.A. Roma Cornelia 14.3 km
- Cornelia (Rome) 14.4 km
- Lumanex DC1 17.0 km
More TIM data centers
- Centrale TIM Trento Nord Italy
- Noovle Italy
- TIM data center in Voghera Italy
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.