Lumanex DC1
Lumanex DC1 is an operational data center operated by Lumanex in Pomezia, Italy. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumanex |
| Networks | 11 networks, 3 internet exchanges PeeringDB. |
| Address | VIA SILVIO PELLICO 19/5, 00071 Pomezia RM |
| Coordinates | 41.66855, 12.50399 |
| Website | c1vhosting.it |
Power and grid
| Nearest high-voltage substation | Pomezia, 150 kV, 2.7 km away (Enel Distribuzione) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Roma Sud, 380 kV, 6.1 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 954 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 17.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.9 °C (2001 to 2025) |
| Cooling degree days | 793 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.53 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | Extremely High (>80%) (Lazio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Lumanex DC1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Pomezia (150 kV), about 2.7 km away.
How clean is the power for Lumanex DC1?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates Lumanex DC1?
Lumanex.
Data centers near Pomezia
- Digital Realty ROM1 - Rome 12.0 km
- TIER IV 17.0 km · 87 MW
- DC Noovle ROMA 17.3 km
- Data center Roma Capitale 18.5 km
- Fiber 23 20.2 km
- Unidata IDC-GALERIA 20.8 km
- Namex Datacenter Rome 25.6 km
- Retelit S.p.A. Roma Cornelia 26.7 km
Sources
Correct this page or get the data