Centrale TIM Trento Nord
Centrale TIM Trento Nord is an operational data center operated by TIM in Trento, Italy. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TIM |
| Facility power | 0.8 MW (range 0.4 MW to 1.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 630 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 46.08465, 11.11508 |
Power and grid
| Nearest high-voltage substation | Trento PSG, 132 kV, 600 m away (Dolomiti Energia) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Lavis, 220 kV, 5 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 1.3 GW in 19 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 7.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.5 °C (2001 to 2025) |
| Cooling degree days | 64 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.57 kWh per m² per day |
| Wind at 50 m | 2 m/s average |
| Water stress today | Low - Medium (10-20%) (Trentino-Alto Adige) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centrale TIM Trento Nord use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
How close is Centrale TIM Trento Nord to the power grid?
The nearest high-voltage substation in OpenStreetMap is Trento PSG (132 kV), about 600 m away.
How clean is the power for Centrale TIM Trento Nord?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates Centrale TIM Trento Nord?
TIM.
Data centers near Trento
- Retelit S.p.A. Trento 2.6 km
- Intacture 24.0 km
- Bolzano - Infranet AG Datacenter 47.2 km
- Sava di Valerio Francesca & C. SAS 50.1 km
- Set 60.7 km · 0.5 MW
- 4ServiceSolutions 64.4 km
More TIM data centers
- TIER IV Italy
- Noovle Italy
- TIM data center in Voghera Italy
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.