Lightboard ⭑ New England
Lightboard ⭑ New England is an operational data center operated by Lightboard ⭑ Built On Light in Springfield, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Lightboard ⭑ Built On Light |
| Networks | 4 networks, 1 internet exchanges PeeringDB. |
| Address | 1 Federal St |
| Coordinates | 42.10952, -72.57631 |
| Website | lbedge.com |
Power and grid
| Nearest high-voltage substation | Clinton Substation, 115 kV, 2.1 km away (Eversource) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Agawam Substation, 345 kV, 5.3 km away |
| HV substations within 10 km | 18 |
| Utility | Massachusetts Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ISNE |
| Nearest gas pipeline | Tennessee Gas Pipeline, interstate pipeline, 5.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.5 GW in 160 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 394 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.78 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Lightboard ⭑ New England to the power grid?
The nearest high-voltage substation in OpenStreetMap is Clinton Substation (115 kV), about 2.1 km away. The local utility is Massachusetts Electric Co, in the ISNE balancing area.
How clean is the power for Lightboard ⭑ New England?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates Lightboard ⭑ New England?
Lightboard ⭑ Built On Light.
Data centers near Springfield
- Crown Castle Springfield (1 Federal) 58 m
- Lightboard ⭑ Massachusetts 97 m
- Cogent Springfield MA 720 m
- MIT Supercloud 10.2 km · 0.3 MW
- MIT LLSC TX-GAIA 11.2 km · 2.6 MW
- Crown Castle Hartford (960 Main) 38.8 km
- Lumen Hartford 41.2 km
- Ergonomic Group 44.8 km
More Lightboard ⭑ Built On Light data centers
- Lightboard ⭑ New York United States
- Lightboard ⭑ Vermont United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.