MIT LLSC TX-GAIA

MIT LLSC TX-GAIA is an operational AI data center operated by US Department of Defense in Holyoke, United States. Its power is about 2.6 MW. Epoch AI estimates about 57 H100-equivalent AI chips (NVIDIA V100).

Key facts

StatusOperational
OperatorUS Department of Defense
Facility power2.6 MW
Reported (Epoch AI or owner data)
AI compute57 H100-equivalents
AI chipsNVIDIA V100
Reported (Epoch AI or owner data)
Chip count896
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressMIT Lincoln Laboratory Supercomputing Center 50 Water St, Holyoke, MA 01040
Coordinates42.20710, -72.60758

Power and grid

Nearest high-voltage substationHolyoke Substation, 115 kV, 800 m away (Holyoke Gas & Electric)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStony Brook Substation, 345 kV, 8.2 km away
HV substations within 10 km20
UtilityCity Of Holyoke (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityISNE
Nearest gas pipelineTennessee Gas Pipeline, interstate pipeline, 3.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.7 GW in 170 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity403 g CO₂ per kWh (Massachusetts, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 65.4%, solar 24.6%, oil and other fossil 4.5%, bioenergy 3.2%, hydro 1.4%. Clean power: 30.1%
Industrial power priceUSD 0.200 per kWh (Massachusetts, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days394 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.78 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayLow - Medium (10-20%) (Massachusetts)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
MIT LLSC TX-GAIANVIDIA V1008962.6 MW2019-09-26

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does MIT LLSC TX-GAIA use?

Public data puts the facility power at about 2.6 MW. Reported (Epoch AI or owner data).

What chips does MIT LLSC TX-GAIA use?

Reported chips: NVIDIA V100.

How close is MIT LLSC TX-GAIA to the power grid?

The nearest high-voltage substation in OpenStreetMap is Holyoke Substation (115 kV), about 800 m away. The local utility is City Of Holyoke, in the ISNE balancing area.

How clean is the power for MIT LLSC TX-GAIA?

The grid in Massachusetts emits about 403 g CO₂ per kWh (2025). Largest sources: gas 65.4%, solar 24.6%, oil and other fossil 4.5%.

Who operates MIT LLSC TX-GAIA?

US Department of Defense.

Data centers near Holyoke

More US Department of Defense data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.