Lumos Networks is an operational data center in Lynchburg, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Coordinates | 37.41569, -79.14271 |
Power and grid
| Nearest high-voltage substation | Peaks View Substation, 138 kV, 3.4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Joshua Falls Substation, 765 kV, 9.5 km away |
| HV substations within 10 km | 14 |
| Utility | Appalachian Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 24.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 322 MW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.1 °C (2001 to 2025) |
| Cooling degree days | 810 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.28 kWh per m² per day |
| Wind at 50 m | 3.9 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Lumos Networks to the power grid?
The nearest high-voltage substation in OpenStreetMap is Peaks View Substation (138 kV), about 3.4 km away. The local utility is Appalachian Power Co, in the PJM balancing area.
How clean is the power for Lumos Networks?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Data centers near Lynchburg
- Microsoft Azure Pioneer-EUS 54.6 km · 1.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.