Microsoft Azure Pioneer-EUS
Microsoft Azure Pioneer-EUS is an operational AI data center operated by Microsoft in Lake Monticello, United States. Its power is about 1.1 MW. Epoch AI estimates about 414 H100-equivalent AI chips (NVIDIA A100).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 1.1 MW Reported (Epoch AI or owner data) |
| AI compute | 414 H100-equivalents |
| AI chips | NVIDIA A100 Reported (Epoch AI or owner data) |
| Chip count | 1,312 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 480 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Virginia |
| Coordinates | 37.67759, -78.61905 |
Power and grid
| Nearest high-voltage substation | Scottsville Substation, 138 kV, 16.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Bremo Substation, 230 kV, 29.3 km away |
| Utility | Central Virginia Electric Coop (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.1 °C (2001 to 2025) |
| Cooling degree days | 810 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.28 kWh per m² per day |
| Wind at 50 m | 3.9 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Microsoft Azure Pioneer-EUS | NVIDIA A100 | 1,312 | 1.1 MW | 2021-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Azure Pioneer-EUS use?
Public data puts the facility power at about 1.1 MW. Reported (Epoch AI or owner data).
What chips does Microsoft Azure Pioneer-EUS use?
Reported chips: NVIDIA A100.
How close is Microsoft Azure Pioneer-EUS to the power grid?
The nearest high-voltage substation in OpenStreetMap is Scottsville Substation (138 kV), about 16.3 km away. The local utility is Central Virginia Electric Coop, in the PJM balancing area.
How clean is the power for Microsoft Azure Pioneer-EUS?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Microsoft Azure Pioneer-EUS?
Microsoft.
Data centers near Lake Monticello
- Lumos Networks 54.6 km
- DBT Data - Harrisonburg Center 89.7 km · 8 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States