Data Center Directory

Nessus NDC1

Nessus NDC1 is an operational data center operated by NESSUS in Vienna, Austria. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorNESSUS
Networks13 networks
PeeringDB.
AddressFernkorngasse 10
Coordinates48.17968, 16.36392
Websitenessus.at

Power and grid

Grid carbon intensity117 g CO₂ per kWh (Austria, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6%
Industrial power priceEUR 0.150 per kWh (Austria, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.5 °C (2001 to 2025)
Cooling degree days241 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.29 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayLow (<10%) (Austria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for Nessus NDC1?

The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.

Who operates Nessus NDC1?

NESSUS.

Data centers near Vienna

More NESSUS data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.