T-Center Vienna
T-Center Vienna is an operational data center operated by T-Systems International in Vienna, Austria. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | T-Systems International |
| Networks | 3 networks PeeringDB. |
| Address | Rennweg 97-99 |
| Coordinates | 48.18729, 16.40223 |
| Website | t-systems.com |
Power and grid
| Grid carbon intensity | 117 g CO₂ per kWh (Austria, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6% |
| Industrial power price | EUR 0.150 per kWh (Austria, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.5 °C (2001 to 2025) |
| Cooling degree days | 241 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.29 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Low (<10%) (Austria) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for T-Center Vienna?
The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.
Who operates T-Center Vienna?
T-Systems International.
Data centers near Vienna
- Vienna BioCenter 220 m
- s IT Solutions AT Spardat Datacenter 1.3 km
- Vienna-Hainburgerstrasse (HS33) 1.3 km
- Nessus NDC2 2.9 km
- Nessus NDC1 3.0 km
- next layer Fleischmarkt 3.1 km
- Raiffeisen Diana Haus (RDH) 3.5 km
- DATASIX Vienna (VIE1) 3.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.