Nextel MSO SPO
Nextel MSO SPO is an operational data center operated by Nextel Telecomunicacoes Ltda. in São Paulo, Brazil. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Nextel Telecomunicacoes Ltda. |
| Address | R. Cajuru 533 |
| Coordinates | -23.54242, -46.59895 |
| Website | nextel.com.br |
Power and grid
| Nearest high-voltage substation | Subestação Miguel Reale, 345 kV, 3.5 km away (CTEEP) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 1.6 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 20.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.9 °C (2001 to 2025) |
| Cooling degree days | 1,094 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.53 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Brazil) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Nextel MSO SPO to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Miguel Reale (345 kV), about 3.5 km away.
How clean is the power for Nextel MSO SPO?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates Nextel MSO SPO?
Nextel Telecomunicacoes Ltda..
Data centers near São Paulo
- Equinix SP1 - São Paulo 3.8 km
- Ultranet SP1 4.1 km
- Ananke 4.3 km
- Scala Data Centers SGRUSP02 5.0 km
- SiDi IARA 5.0 km · 0.2 MW
- FIBRAREDE GESTAO E SERVICOS DE INFRAESTRUTURA 5.3 km
- PIX Embratel SP 5.4 km
- Laboratório MackLeaps 5.5 km
More Nextel Telecomunicacoes Ltda. data centers
- Nextel MSO RJO Brazil
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.