NextStream Data Center
NextStream Data Center is an operational data center operated by Actis in Paine, Chile. Our footprint estimate of its power is about 3.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Actis |
| Facility power | 3.7 MW (range 1.5 MW to 9.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 30,653 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Avenida Presidente Prieto 226 |
| Coordinates | -33.81206, -70.74886 |
| Website | act.is |
Power and grid
| Grid carbon intensity | 291 g CO₂ per kWh (Chile, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | solar 25.1%, hydro 22.2%, coal 17.8%, gas 15.3%, wind 13.1%. Clean power: 66.4% |
Climate and water
| Water stress today | Extremely High (>80%) (Chile) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NextStream Data Center use?
We estimate the facility power at about 3.7 MW. Estimate from building footprint, low confidence.
How clean is the power for NextStream Data Center?
The grid in Chile emits about 291 g CO₂ per kWh (2025). Largest sources: solar 25.1%, hydro 22.2%, coal 17.8%.
Who operates NextStream Data Center?
Actis.
Data centers near Paine
- IBM data center / Centro Tecnológico San Bernardo 29.0 km · 1.6 MW
- Amazon Web Services 29.0 km · 4.8 MW
- Odata Data Center 31.4 km · 14 MW
- Grupo ZGH - La Florida 32.4 km
- CMET 35.5 km
- DC Porvenir 41.1 km
- Mediaflog 41.3 km
- Equinix ST1/ST2 - Santiago 41.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.