Data Center Directory

NOS Imopolis II

NOS Imopolis II is an operational data center operated by NOS in Carnaxide, Portugal. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
OperatorNOS
Facility power13 MW (range 6.4 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,650 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asNOS Imopolis I
Coordinates38.72512, -9.23054

Power and grid

Nearest high-voltage substationUnnamed substation, 220 kV, 1.7 km away (REN)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km9
Power plants within 50 km1.9 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity128 g CO₂ per kWh (Portugal, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 29.7%, wind 26.8%, solar 17.3%, gas 16.5%, bioenergy 6.6%. Clean power: 80.9%
Industrial power priceEUR 0.090 per kWh (Portugal, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature16.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.7 °C (2001 to 2025)
Cooling degree days675 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.87 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayHigh (40-80%) (Portugal)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NOS Imopolis II use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is NOS Imopolis II to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (220 kV), about 1.7 km away.

How clean is the power for NOS Imopolis II?

The grid in Portugal emits about 128 g CO₂ per kWh (2025). Largest sources: hydro 29.7%, wind 26.8%, solar 17.3%.

Who operates NOS Imopolis II?

NOS.

Data centers near Carnaxide

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.