Data Center Directory

Seixal Colocation Site

Seixal Colocation Site is an operational data center operated by TATA Communications in Charneca de Caparica, Portugal. Our footprint estimate of its power is about 2.5 MW.

Key facts

StatusOperational
OperatorTATA Communications
Facility power2.5 MW (range 1.3 MW to 4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,086 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates38.60000, -9.15986

Power and grid

Nearest high-voltage substationUnnamed substation, 150 kV, 2.4 km away (REN)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestação de Fernão Ferro, 400 kV, 4 km away
HV substations within 10 km7
Power plants within 50 km1.7 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity128 g CO₂ per kWh (Portugal, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 29.7%, wind 26.8%, solar 17.3%, gas 16.5%, bioenergy 6.6%. Clean power: 80.9%
Industrial power priceEUR 0.090 per kWh (Portugal, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature16.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.7 °C (2001 to 2025)
Cooling degree days675 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.87 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayHigh (40-80%) (Portugal)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Seixal Colocation Site use?

We estimate the facility power at about 2.5 MW. Estimate from building footprint, low confidence.

How close is Seixal Colocation Site to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (150 kV), about 2.4 km away.

How clean is the power for Seixal Colocation Site?

The grid in Portugal emits about 128 g CO₂ per kWh (2025). Largest sources: hydro 29.7%, wind 26.8%, solar 17.3%.

Who operates Seixal Colocation Site?

TATA Communications.

Data centers near Charneca de Caparica

More TATA Communications data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.