Tata Communications Highbridge Datacentre
Tata Communications Highbridge Datacentre is an operational data center operated by Tata Communications in Burnham-on-Sea, United Kingdom. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Tata Communications |
| Facility power | 10 MW (range 5.1 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,470 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.22753, -2.96316 |
Power and grid
| Nearest high-voltage substation | loxton, 400 kV, 7.9 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 3.5 GW in 161 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.8 °C (2001 to 2025) |
| Cooling degree days | 14 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Tata Communications Highbridge Datacentre use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
How close is Tata Communications Highbridge Datacentre to the power grid?
The nearest high-voltage substation in OpenStreetMap is loxton (400 kV), about 7.9 km away.
How clean is the power for Tata Communications Highbridge Datacentre?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Tata Communications Highbridge Datacentre?
Tata Communications.
Data centers near Burnham-on-Sea
- Insight Data Ltd 15.0 km
- Keppel Data Centres | Cardiff Data Centre 29.4 km
- BT Empire Exchange / Stadium House 31.7 km
- Microsoft Newport data centre 36.4 km · 25 MW
- Vantage Data Centers - CWL13 36.7 km · 6.1 MW
- Vantage Data Centers - CWL1 36.9 km · 17 MW
- nLighten Bristol 43.7 km · 7.4 MW
- nLighten Bristol BRS1 43.9 km
More Tata Communications data centers
- TGN Hillsboro United States
- Seixal Colocation Site Portugal
- TATA Communications - Piti Cable Landing Station Guam
- TATA Communications Delhi India
- TATA Communications Kolkata India
- TATA Communications Mumbai India
- TATA Communications Stratford United Kingdom