Data Center Directory

Nxtra Data Chennai

Nxtra Data Chennai is an operational data center in Nāvalūr, India. Our footprint estimate of its power is about 1.2 MW.

Key facts

StatusOperational
Facility power1.2 MW (range 0.6 MW to 2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,029 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 510 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates12.83061, 80.22102
Websitenxtra.in/data_center/chennai-data-centre

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 1.6 km away (TANTRANSCO)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km6
Power plants within 50 km4.3 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity666 g CO₂ per kWh (India, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 70%, solar 9.8%, hydro 8.5%, wind 5%, nuclear 2.6%. Clean power: 27.1%

Climate and water

Average temperature28 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.7 °C (2001 to 2025)
Cooling degree days3,708 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.22 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayExtremely High (>80%) (Tamil Nadu)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Nxtra Data Chennai use?

We estimate the facility power at about 1.2 MW. Estimate from building footprint, low confidence.

How close is Nxtra Data Chennai to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1.6 km away.

How clean is the power for Nxtra Data Chennai?

The grid in India emits about 666 g CO₂ per kWh (2025). Largest sources: coal 70%, solar 9.8%, hydro 8.5%.

Data centers near Nāvalūr

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.