O
O is an operational data center in Etterbeek, Belgium. Our footprint estimate of its power is about 0.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.9 MW (range 0.4 MW to 1.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 717 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 380 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 50.81480, 4.38349 |
Power and grid
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.6 °C (2001 to 2025) |
| Cooling degree days | 87 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.03 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does O use?
We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.
How clean is the power for O?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Data centers near Etterbeek
- VERIXI Louise DC 1.4 km
- Level(3) Brussels 5.2 km · 5.9 MW
- Woluwedal 102 6.2 km
- Proximus Netcenter 7.2 km
- DC Evere 7.3 km
- brusselsdc 8.9 km · 1.3 MW
- Digital Realty BRU1 - Brussels 9.0 km · 9.6 MW
- MCI/Verizon Brussels (Diegem) E 9.1 km