Data Center Directory

OMADATA - E3 - UPG

OMADATA - E3 - UPG is an operational data center operated by PT Omadata Padma Indonesia in Makassar, Indonesia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorPT Omadata Padma Indonesia
Networks7 networks, 1 internet exchanges
PeeringDB.
AddressCentre point boulevard no.16 Tamalate, Maccini sombala
Coordinates-5.15596, 119.44036
Websiteomadata.com

Power and grid

Grid carbon intensity705 g CO₂ per kWh (Indonesia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8%

Climate and water

Water stress todayMedium - High (20-40%) (Indonesia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for OMADATA - E3 - UPG?

The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.

Who operates OMADATA - E3 - UPG?

PT Omadata Padma Indonesia.

Data centers near Makassar

More PT Omadata Padma Indonesia data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.