neuCentrIX - Makassar Mattoangin
neuCentrIX - Makassar Mattoangin is an operational data center operated by PT Telekomunikasi Indonesia Int in Makassar, Indonesia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | PT Telekomunikasi Indonesia Int |
| Networks | 15 networks, 1 internet exchanges PeeringDB. |
| Address | DC NeuCentrIX Batu Ampar II Jl. Matoangin, |
| Coordinates | -5.16147, 119.41544 |
| Website | neucentrix.co.id/en/service/colocation |
Power and grid
| Nearest high-voltage substation | Gardu Induk Panakkukang, 150 kV, 3.4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 139 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 705 g CO₂ per kWh (Indonesia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8% |
Climate and water
| Average temperature | 27.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.3 °C (2001 to 2025) |
| Cooling degree days | 3,440 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.36 kWh per m² per day |
| Wind at 50 m | 4.1 m/s average |
| Water stress today | Medium - High (20-40%) (Indonesia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is neuCentrIX - Makassar Mattoangin to the power grid?
The nearest high-voltage substation in OpenStreetMap is Gardu Induk Panakkukang (150 kV), about 3.4 km away.
How clean is the power for neuCentrIX - Makassar Mattoangin?
The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.
Who operates neuCentrIX - Makassar Mattoangin?
PT Telekomunikasi Indonesia Int.
Data centers near Makassar
- OMADATA - E3 - UPG 2.8 km
- IDC Makassar 3.0 km
- Biznet BigPOP Makassar Mancini 3.2 km
- IIX-Sulampua 4.0 km
More PT Telekomunikasi Indonesia Int data centers
- Hyperscale Data Center (HDC) Indonesia
- neuCentrIX - Balikpapan Batu Ampar Indonesia
- neuCentrIX - Bandung Indonesia
- neuCentrIX - Batam Indonesia
- neuCentrIX - Denpasar Kaliasem Indonesia
- neuCentriX - Jatinegara Indonesia
- neuCentrIX - Karet Tengsin Indonesia
- neuCentrIX - Malang Indonesia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.