neuCentrIX - Bandung is an operational data center operated by PT Telekomunikasi Indonesia Int in Kota Bandung, Indonesia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | PT Telekomunikasi Indonesia Int |
| Networks | 69 networks, 2 internet exchanges PeeringDB. |
| Address | neuCentrIX Lembong; Jl. Lembong No.11, Braga,, Kec. Sumur Bandung, Kota Bandung, Jawa Barat 40111 |
| Coordinates | -6.91676, 107.61138 |
| Website | telkom.co.id |
Power and grid
| Nearest high-voltage substation | Gardu Induk Cigereleng, 150 kV, 4 km away (Perusahaan Listrik Negara) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | GITET Bandung Selatan, 500 kV, 16.4 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 2.9 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 705 g CO₂ per kWh (Indonesia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8% |
Climate and water
| Average temperature | 21.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30.8 °C (2001 to 2025) |
| Cooling degree days | 1,341 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.01 kWh per m² per day |
| Wind at 50 m | 3.3 m/s average |
| Water stress today | Medium - High (20-40%) (Indonesia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is neuCentrIX - Bandung to the power grid?
The nearest high-voltage substation in OpenStreetMap is Gardu Induk Cigereleng (150 kV), about 4 km away.
How clean is the power for neuCentrIX - Bandung?
The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.
Who operates neuCentrIX - Bandung?
PT Telekomunikasi Indonesia Int.
Data centers near Kota Bandung
- Wide Host Media - Bandung 667 m
- DATA CENTER NEUVIZ 850 m
- NAMA 1.7 km
- Biznet BigPOP Bandung Margahayu Utara 4.9 km
- BD1 7.8 km
- Fiqran Solusindo Mediatama 17.3 km
- Amazon Web Services 62.0 km · 14 MW
- DCI Indonesia H2-02 69.2 km · 80 MW
More PT Telekomunikasi Indonesia Int data centers
- Hyperscale Data Center (HDC) Indonesia
- neuCentrIX - Balikpapan Batu Ampar Indonesia
- neuCentrIX - Batam Indonesia
- neuCentrIX - Denpasar Kaliasem Indonesia
- neuCentriX - Jatinegara Indonesia
- neuCentrIX - Karet Tengsin Indonesia
- neuCentrIX - Makassar Mattoangin Indonesia
- neuCentrIX - Malang Indonesia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.