Data Center Directory

OVHcloud Gravelines

OVHcloud Gravelines is an operational data center operated by OVHcloud in Gravelines, France. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorOVHcloud
Facility power12 MW (range 4.7 MW to 29 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 97,287 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressRoute de la Ferme Masson, 59820, Gravelines
Coordinates51.01665, 2.15523
Websiteovh.com/fr/a1141.datacenter-ovh-gravelines

Power and grid

Nearest high-voltage substationPoste électrique de Duvigneau, 225 kV, 100 m away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km26
Power plants within 50 km6.4 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature11.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.8 °C (2001 to 2025)
Cooling degree days25 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.13 kWh per m² per day
Wind at 50 m7.9 m/s average
Water stress todayHigh (40-80%) (Hauts-de-France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does OVHcloud Gravelines use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

How close is OVHcloud Gravelines to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Duvigneau (225 kV), about 100 m away.

How clean is the power for OVHcloud Gravelines?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates OVHcloud Gravelines?

OVHcloud.

Data centers near Gravelines

More OVHcloud data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.