OVHcloud - Hillsboro
OVHcloud - Hillsboro is an operational data center operated by OVHcloud in Hillsboro, United States. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | OVHcloud |
| Facility power | 14 MW (range 6.8 MW to 22 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,357 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Northeast 25th Avenue 1300, 97124, Hillsboro |
| Coordinates | 45.53406, -122.95590 |
| Website | us.ovhcloud.com |
Power and grid
| Utility | Portland General Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PGE |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 17.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does OVHcloud - Hillsboro use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How clean is the power for OVHcloud - Hillsboro?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates OVHcloud - Hillsboro?
OVHcloud.
Data centers near Hillsboro
- NTT RagingWire DC - Hillsboro 2.1 km · 22 MW
- RagingWire HI1 - NTT 2.2 km · 30 MW
- Aligned DC - PDX-01 2.3 km · 14 MW
- HLBOORXH - Hawthorne Central Office 2.4 km
- STACK Infrastructure data center in Hillsboro 2.5 km · 6.9 MW
- Stack Infrastructure - POR03 2.5 km · 8.6 MW
- Adobe Data Center 2.6 km · 11 MW
- Flexential - Portland/Hillsboro 4 (PDX04) 2.7 km · 21 MW
More OVHcloud data centers
- OVHcloud, Centre de données de Beauharnois Canada
- OVHcloud Roubaix - RBX2 France
- OVHcloud Gravelines France
- OVHcloud Ożarów (WAW-1) Poland
- OVHcloud Roubaix - RBX7 France
- OVHcloud Strasbourg - SBG-5 Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.