Plan B Albany
Plan B Albany is an operational data center operated by Plan B in Albany, New Zealand. Our footprint estimate of its power is about 1.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Plan B |
| Facility power | 1.9 MW (range 0.9 MW to 3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,574 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 810 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Plan B Data Centre |
| Address | 3a William Pickering Drive |
| Coordinates | -36.75250, 174.70599 |
| Website | planb.co.nz |
Power and grid
| Grid carbon intensity | 96 g CO₂ per kWh (New Zealand, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 53.7%, other renewables 22%, wind 9.5%, gas 8.6%, solar 1.8%. Clean power: 88.2% |
Climate and water
| Average temperature | 16.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 26.1 °C (2001 to 2025) |
| Cooling degree days | 170 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.29 kWh per m² per day |
| Wind at 50 m | 7.8 m/s average |
| Water stress today | Low (<10%) (Auckland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Plan B Albany use?
We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.
How clean is the power for Plan B Albany?
The grid in New Zealand emits about 96 g CO₂ per kWh (2025). Largest sources: hydro 53.7%, other renewables 22%, wind 9.5%.
Who operates Plan B Albany?
Plan B.
Data centers near Albany
- Spark Data Centre 571 m · 1.8 MW
- HDDC 661 m
- Plan B Tarndale Grove 826 m
- 2degrees Auckland - Albany 893 m · 6.3 MW
- DCI Data Centre AKL-02 1.0 km · 6 MW
- Albany Data Centre 1.2 km
- Umbrellar AKL1 1.9 km
- Datacom - Orbit Data Centre (Auckland) 2.4 km · 20 MW
More Plan B data centers
- Plan B Tarndale Grove New Zealand
- Plan B Tawa New Zealand
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.