Data Center Directory

Spark Data Centre

Spark Data Centre is an operational data center in Auckland, New Zealand. Our footprint estimate of its power is about 1.8 MW.

Key facts

StatusOperational
Facility power1.8 MW (range 0.9 MW to 2.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 754 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 770 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWilliam Pickering Drive 2/20, Auckland
Coordinates-36.74975, 174.70057

Power and grid

Grid carbon intensity96 g CO₂ per kWh (New Zealand, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 53.7%, other renewables 22%, wind 9.5%, gas 8.6%, solar 1.8%. Clean power: 88.2%

Climate and water

Average temperature16.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature27.9 °C (2001 to 2025)
Cooling degree days205 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.29 kWh per m² per day
Wind at 50 m7.8 m/s average
Water stress todayLow (<10%) (Auckland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Spark Data Centre use?

We estimate the facility power at about 1.8 MW. Estimate from building footprint, low confidence.

How clean is the power for Spark Data Centre?

The grid in New Zealand emits about 96 g CO₂ per kWh (2025). Largest sources: hydro 53.7%, other renewables 22%, wind 9.5%.

Data centers near Auckland

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.