Polaris Data Centre
Polaris Data Centre is an operational data center operated by Polaris Data Centre in Brisbane, Australia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Polaris Data Centre |
| Networks | 14 networks, 1 internet exchanges PeeringDB. |
| Address | 11 Mary Macenroth Lane, Springfield QLD 4300 |
| Coordinates | -27.68173, 152.89865 |
| Website | polarisdatacentre.com.au |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 6.5 km away (Powerlink) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 275 kV, 7.1 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 956 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 21.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 1,318 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.15 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Queensland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Polaris Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 6.5 km away.
How clean is the power for Polaris Data Centre?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Polaris Data Centre?
Polaris Data Centre.
Data centers near Brisbane
- Digital Sense Brisbane 19.5 km
- Fujitsu Eight Mile Plains 22.5 km
- Interactive Brisbane 22.6 km
- Host Networks BNE1 22.9 km
- DigiCo Brisbane BNE (iseek IR) 25.1 km
- Syncom B1 26.2 km
- Rail Centre 1 27.0 km
- AAPT Brisbane 27.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.