Data Center Directory

DigiCo Brisbane BNE (iseek IR)

DigiCo Brisbane BNE (iseek IR) is an operational data center operated by DigiCo in Woolloongabba, Australia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorDigiCo
Networks2 networks, 1 internet exchanges
PeeringDB.
AddressLevel 1, 100 Ipswich Road
Coordinates-27.49132, 153.03540
Websiteiseek.com.au

Power and grid

Nearest high-voltage substationWellington Road substation, 110 kV, 900 m away (Energex)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationRocklea Substation, 275 kV, 7.7 km away
HV substations within 10 km19
Power plants within 50 km960 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature21.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.6 °C (2001 to 2025)
Cooling degree days1,318 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.15 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayLow - Medium (10-20%) (Queensland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is DigiCo Brisbane BNE (iseek IR) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Wellington Road substation (110 kV), about 900 m away.

How clean is the power for DigiCo Brisbane BNE (iseek IR)?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates DigiCo Brisbane BNE (iseek IR)?

DigiCo.

Data centers near Woolloongabba

More DigiCo data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.