DigiCo BNE2
DigiCo BNE2 is an operational data center operated by DigiCo in Nundah, Australia. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DigiCo |
| Facility power | 12 MW (range 6 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,971 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Cycas Lane 4 |
| Coordinates | -27.41660, 153.09217 |
| Website | digi-co.com.au/location/brisbane-bne2 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 2.5 km away (Energex) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 275 kV, 4 km away |
| HV substations within 10 km | 18 |
| Power plants within 50 km | 960 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 21.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 1,318 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.15 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Queensland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DigiCo BNE2 use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How close is DigiCo BNE2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 2.5 km away.
How clean is the power for DigiCo BNE2?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates DigiCo BNE2?
DigiCo.
Data centers near Nundah
- Keppel Data Centres | iSeek Data Centre 138 m · 4.1 MW
- NEXTDC B2 7.1 km
- Equinix BR1 - Brisbane (formerly Metronode Brisbane 1) 7.2 km
- Over the Wire - 360 St Pauls 7.3 km
- 5GN Brisbane Data Centre (BDC) 7.4 km
- AAPT Fortitude Valley 7.7 km
- Christie Systems DC1 8.2 km
- NEXTDC B1 8.2 km
More DigiCo data centers
- DigiCo Sydney SYD1 (formerly Global Switch Australia) Australia
- DigiCo ADL1 Australia
- DigiCo Sydney SYD2 (iseek GH) Australia
- DigiCo Townsville TSV1 (iseek NQRDC) Australia
- DigiCo Adelaide ADL2 (YourDC Hawthorn) Australia
- DigiCo Adelaide ADL1 (YourDC Ed Parks) Australia
- DigiCo Brisbane BNE (iseek IR) Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.