DigiCo BNE2

DigiCo BNE2 is an operational data center operated by DigiCo in Nundah, Australia. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorDigiCo
Facility power12 MW (range 6 MW to 19 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,971 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCycas Lane 4
Coordinates-27.41660, 153.09217
Websitedigi-co.com.au/location/brisbane-bne2

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 2.5 km away (Energex)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 275 kV, 4 km away
HV substations within 10 km18
Power plants within 50 km960 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature21.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.6 °C (2001 to 2025)
Cooling degree days1,318 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.15 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayLow - Medium (10-20%) (Queensland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does DigiCo BNE2 use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

How close is DigiCo BNE2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 2.5 km away.

How clean is the power for DigiCo BNE2?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates DigiCo BNE2?

DigiCo.