DigiCo Adelaide ADL2 (YourDC Hawthorn)
DigiCo Adelaide ADL2 (YourDC Hawthorn) is an operational data center operated by DigiCo in Adelaide, Australia. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DigiCo |
| Facility power | 1.4 MW (range 0.7 MW to 2.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,138 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 39 networks, 3 internet exchanges PeeringDB. |
| Also known as | DigiCo ADL2 |
| Address | 60 Belair Road |
| Coordinates | -34.96846, 138.60824 |
| Website | yourdc.com.au |
Power and grid
| Nearest high-voltage substation | City West, 275 kV, 4.1 km away (Electranet) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 2.6 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 15.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.2 °C (2001 to 2025) |
| Cooling degree days | 531 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.14 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | Medium - High (20-40%) (South Australia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DigiCo Adelaide ADL2 (YourDC Hawthorn) use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How close is DigiCo Adelaide ADL2 (YourDC Hawthorn) to the power grid?
The nearest high-voltage substation in OpenStreetMap is City West (275 kV), about 4.1 km away.
How clean is the power for DigiCo Adelaide ADL2 (YourDC Hawthorn)?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates DigiCo Adelaide ADL2 (YourDC Hawthorn)?
DigiCo.
Data centers near Adelaide
- Colocity DC1 4.4 km
- Adam Data Centre 4.7 km
- AAPT Adelaide 4.8 km
- NEXTDC A1 4.8 km · 9.5 MW
- PIPE Networks Adelaide 4.8 km
- Colocity DC3 4.8 km
- Internode DC 4.9 km
- Kern DC - Adelaide 4.9 km
More DigiCo data centers
- DigiCo Sydney SYD1 (formerly Global Switch Australia) Australia
- DigiCo BNE2 Australia
- DigiCo ADL1 Australia
- DigiCo Sydney SYD2 (iseek GH) Australia
- DigiCo Townsville TSV1 (iseek NQRDC) Australia
- DigiCo Adelaide ADL1 (YourDC Ed Parks) Australia
- DigiCo Brisbane BNE (iseek IR) Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.