Adam Data Centre

Adam Data Centre is an operational data center operated by Vocus in Mile End South, Australia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorVocus
Networks3 networks
PeeringDB.
Address19-47 London Rd
Coordinates-34.93674, 138.57422
Websiteadam.com.au

Power and grid

Nearest high-voltage substationCity West, 275 kV, 600 m away (Electranet)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
Power plants within 50 km2.6 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature15.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.2 °C (2001 to 2025)
Cooling degree days531 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.14 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayMedium - High (20-40%) (South Australia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Adam Data Centre to the power grid?

The nearest high-voltage substation in OpenStreetMap is City West (275 kV), about 600 m away.

How clean is the power for Adam Data Centre?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Adam Data Centre?

Vocus.

Data centers near Mile End South

More Vocus data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.