DigiCo Townsville TSV1 (iseek NQRDC)

DigiCo Townsville TSV1 (iseek NQRDC) is an operational data center operated by DigiCo in Garbutt, Australia. Our footprint estimate of its power is about 2 MW.

Key facts

StatusOperational
OperatorDigiCo
Facility power2 MW (range 1 MW to 3.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,696 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 850 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asDigiCo TSV1
Address125-129 Dalrymple Road
Coordinates-19.27155, 146.77061
Websiteiseek.com.au

Power and grid

Nearest high-voltage substationGarbutt Substation, 132 kV, 800 m away (Ergon Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationRoss Substation, 275 kV, 15.5 km away
HV substations within 10 km4
Power plants within 50 km903 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature24.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.1 °C (2001 to 2025)
Cooling degree days2,358 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.6 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayLow - Medium (10-20%) (Queensland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does DigiCo Townsville TSV1 (iseek NQRDC) use?

We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.

How close is DigiCo Townsville TSV1 (iseek NQRDC) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Garbutt Substation (132 kV), about 800 m away.

How clean is the power for DigiCo Townsville TSV1 (iseek NQRDC)?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates DigiCo Townsville TSV1 (iseek NQRDC)?

DigiCo.