Positive Park
Positive Park is an operational data center operated by Positive Internet in March, United Kingdom. Our footprint estimate of its power is about 0.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Positive Internet |
| Facility power | 0.9 MW (range 0.4 MW to 1.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 734 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 380 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 52.58375, 0.05651 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Positive Park use?
We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.
How clean is the power for Positive Park?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Positive Park?
Positive Internet.
Data centers near March
- Data center in Peterborough 21.8 km · 4.9 MW
- EXA Edge DC Peterborough 22.0 km
- MyHostingSpace - Peterborough 30.4 km
- Fast2host - Fast4networks Ltd 32.9 km
- US Air Force data center in Brandon 39.2 km · 0.8 MW
- Redcentric Cambridge 39.8 km
- West Cambridge Data Centre 41.7 km · 1.3 MW
Sources
Correct this page or get the data