US Air Force data center in Brandon is an operational data center operated by US Air Force in Brandon, United Kingdom. Our footprint estimate of its power is about 0.8 MW.

Key facts

StatusOperational
OperatorUS Air Force
Facility power0.8 MW (range 0.4 MW to 1.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 665 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 340 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressIP7 9PN, Brandon
Coordinates52.39887, 0.55021

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 12.8 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationBurwell Substation, 400 kV, 20.8 km away
Power plants within 50 km2.8 GW in 66 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.5 °C (2001 to 2025)
Cooling degree days33 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.9 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does US Air Force data center in Brandon use?

We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.

How close is US Air Force data center in Brandon to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 12.8 km away.

How clean is the power for US Air Force data center in Brandon?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates US Air Force data center in Brandon?

US Air Force.

Data centers near Brandon

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.