Previder PDC1 is an operational data center operated by Previder in Hengelo, Netherlands. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorPrevider
Networks11 networks
PeeringDB.
AddressExpolaan 50
Coordinates52.28512, 6.76789
Websiteprevider.nl

Power and grid

Nearest high-voltage substation110 kV Weideweg, 110 kV, 1.3 km away (TenneT)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation380 kV Hengelo, 380 kV, 4.1 km away
HV substations within 10 km11
Power plants within 50 km3.1 GW in 78 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity254 g CO₂ per kWh (Netherlands, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2%
Industrial power priceEUR 0.139 per kWh (Netherlands, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.8 °C (2001 to 2025)
Cooling degree days74 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.9 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayLow (<10%) (Overijssel)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is Previder PDC1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is 110 kV Weideweg (110 kV), about 1.3 km away.

How clean is the power for Previder PDC1?

The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.

Who operates Previder PDC1?

Previder.

Data centers near Hengelo

More Previder data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.