Qonnected II Markelo (Cellnex)
Qonnected II Markelo (Cellnex) is an operational data center operated by Qonnected in Markelo, Netherlands. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Qonnected |
| Networks | 3 networks PeeringDB. |
| Address | Larenseweg 58 |
| Coordinates | 52.23700, 6.44128 |
| Website | qonnected.nl |
Power and grid
| Nearest high-voltage substation | 110 kV Rijssen, 110 kV, 7.6 km away (TenneT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Hengelo, 380 kV, 21.7 km away |
| HV substations within 10 km | 2 |
| Power plants within 50 km | 1.2 GW in 87 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 83 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.9 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low (<10%) (Gelderland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Qonnected II Markelo (Cellnex) to the power grid?
The nearest high-voltage substation in OpenStreetMap is 110 kV Rijssen (110 kV), about 7.6 km away.
How clean is the power for Qonnected II Markelo (Cellnex)?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates Qonnected II Markelo (Cellnex)?
Qonnected.
Data centers near Markelo
- ITB2 Datacenter Deventer 16.8 km
- Previder PDC2 22.2 km
- Previder PDC1 22.9 km
- InterDC Hengelo 24.1 km
- InterDC Enschede Marssteden 26.0 km
- Equinix EN1 - Enschede 27.8 km
- ITB2 Datacenter Apeldoorn 28.6 km
- InterDC Enschede 28.9 km
More Qonnected data centers
- Qonnected I (HDB01) - aka Ecostora Netherlands
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.