ITB2 Datacenter Deventer
ITB2 Datacenter Deventer is an operational data center operated by ITB-Kwadraat in Deventer, Netherlands. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | ITB-Kwadraat |
| Networks | 6 networks PeeringDB. |
| Address | Herfordstraat 18, 18 |
| Coordinates | 52.23867, 6.19515 |
| Website | itb-kwadraat.nl/datacenters/deventer |
Power and grid
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 83 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.9 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low (<10%) (Overijssel) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for ITB2 Datacenter Deventer?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates ITB2 Datacenter Deventer?
ITB-Kwadraat.
Data centers near Deventer
- ITB2 Datacenter Apeldoorn 12.3 km
- KoloDC NL3 13.2 km · 2.1 MW
- Qonnected II Markelo (Cellnex) 16.8 km
- Cellnex 21.8 km
- Equinix ZW1 - Zwolle 28.0 km
- ILA/Regeneration site PoP-Doetinchem 28.7 km
- IAF DC1 30.2 km
- InterDC Doetinchem 32.4 km
More ITB-Kwadraat data centers
- ITB2 Datacenter Apeldoorn Netherlands
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.