Equinix ZW1 - Zwolle
Equinix ZW1 - Zwolle is an operational data center operated by Equinix in Zwolle, Netherlands. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 14 networks, 2 internet exchanges PeeringDB. |
| Also known as | Equinix Zwolle ZW1 |
| Address | Telfordstraat 3 |
| Coordinates | 52.48849, 6.14270 |
| Website | equinix.com |
Power and grid
| Nearest high-voltage substation | 110 kV Weteringkade, 110 kV, 2 km away (TenneT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Zwolle, 380 kV, 5.6 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 2.8 GW in 108 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 67 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.9 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low (<10%) (Overijssel) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix ZW1 - Zwolle to the power grid?
The nearest high-voltage substation in OpenStreetMap is 110 kV Weteringkade (110 kV), about 2 km away.
How clean is the power for Equinix ZW1 - Zwolle?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates Equinix ZW1 - Zwolle?
Equinix.
Data centers near Zwolle
- KoloDC NL2 25.7 km
- Kolo NL2 Meppel 25.8 km
- ILA/Regeneration site PoP-Ens 26.6 km
- ITB2 Datacenter Deventer 28.0 km
- KoloDC NL3 28.5 km · 2.1 MW
- KoloDC NL1 30.2 km
- Solcon Datacenter Dronten 30.3 km
- ITB2 Datacenter Apeldoorn 33.0 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.