KoloDC NL3 is an operational data center operated by KoloDC in Apeldoorn, Netherlands. Our footprint estimate of its power is about 2.1 MW.

Key facts

StatusOperational
OperatorKoloDC
Facility power2.1 MW (range 1 MW to 3.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,734 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks13 networks, 1 internet exchanges
PeeringDB.
Also known asKolo NL3 Apeldoorn
AddressLaan van de Ram 39
Opened2009
Coordinates52.24703, 6.00160
Websitekolodc.com

Power and grid

Nearest high-voltage substation150 kV Zuidbroek, 150 kV, 100 m away (TenneT)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation380 kV Zwolle, 380 kV, 34 km away
HV substations within 10 km5
Power plants within 50 km2.7 GW in 109 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity254 g CO₂ per kWh (Netherlands, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2%
Industrial power priceEUR 0.139 per kWh (Netherlands, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.7 °C (2001 to 2025)
Cooling degree days83 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.9 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayLow (<10%) (Gelderland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does KoloDC NL3 use?

We estimate the facility power at about 2.1 MW. Estimate from building footprint, low confidence.

How close is KoloDC NL3 to the power grid?

The nearest high-voltage substation in OpenStreetMap is 150 kV Zuidbroek (150 kV), about 100 m away.

How clean is the power for KoloDC NL3?

The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.

Who operates KoloDC NL3?

KoloDC.