PureColo ROC01 (Rochester)
PureColo ROC01 (Rochester) is an operational data center operated by PureColo in Pittsford, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | PureColo |
| Networks | 1 networks PeeringDB. |
| Address | 1100 Pittsford Victor Road |
| Coordinates | 43.04927, -77.46658 |
| Website | RochesterColo.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 4.4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Station 122, 345 kV, 6.7 km away |
| HV substations within 10 km | 4 |
| Utility | Rochester Gas & Electric Corp (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | NYIS |
| Nearest gas pipeline | Empire Pipeline, intrastate pipeline, 3.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 826 MW in 45 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.3 °C (2001 to 2025) |
| Cooling degree days | 365 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.56 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is PureColo ROC01 (Rochester) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 4.4 km away. The local utility is Rochester Gas & Electric Corp, in the NYIS balancing area.
How clean is the power for PureColo ROC01 (Rochester)?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates PureColo ROC01 (Rochester)?
PureColo.
Data centers near Pittsford
- Landmax Data Systems, Inc 15.7 km
- Gafachi 1 West Main Rochester 16.7 km
- CentriLogic Rochester (ROC) 21.3 km
- Greenidge Power Plant and Data Center 58.9 km · 20 MW
More PureColo data centers
- PureColo OTT01 (Ottawa DC1) Canada
- PureColo OTT02 (Ottawa DC2) Canada
- PureColo PER01 (Perth) Australia
- PureColo STJ01 (Saint John) Canada
- PureColo VAN01 (Vancouver) Canada
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.