Greenidge Power Plant and Data Center
Greenidge Power Plant and Data Center is an operational data center operated by Greenidge Generation in Penn Yan, United States. Our footprint estimate of its power is about 20 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Greenidge Generation |
| Facility power | 20 MW (range 9.8 MW to 32 MW) Estimate from building footprint, low confidence. Footprint estimate: about 16,408 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 8,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 42.67936, -76.94858 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 200 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Utility | New York State Elec & Gas Corp (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | NYIS |
| Nearest gas pipeline | Empire Pipeline, intrastate pipeline, 4.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 278 MW in 36 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.4 °C (2001 to 2025) |
| Cooling degree days | 327 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.62 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Greenidge Power Plant and Data Center use?
We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.
How close is Greenidge Power Plant and Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 200 m away. The local utility is New York State Elec & Gas Corp, in the NYIS balancing area.
How clean is the power for Greenidge Power Plant and Data Center?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates Greenidge Power Plant and Data Center?
Greenidge Generation.
Data centers near Penn Yan
- PureColo ROC01 (Rochester) 58.9 km
- Northland Communications - Syracuse 76.5 km
- Lightboard ⭑ New York 77.0 km
- SU Green Data Center 77.3 km · 2 MW
Sources