SU Green Data Center
SU Green Data Center is an operational data center operated by Syracuse University in Onondaga, United States. Our footprint estimate of its power is about 2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Syracuse University |
| Facility power | 2 MW (range 1 MW to 3.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,652 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 850 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Skytop Road 623, 13210, Onondaga |
| Coordinates | 43.01208, -76.11593 |
Power and grid
| Nearest high-voltage substation | OCRRA, 115 kV, 800 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Lafayette Station, 345 kV, 4.4 km away |
| HV substations within 10 km | 24 |
| Utility | Niagara Mohawk Power Corp. (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | NYIS |
| Nearest gas pipeline | Tennessee Gas Pipeline, interstate pipeline, 11.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 496 MW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.3 °C (2001 to 2025) |
| Cooling degree days | 365 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.58 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does SU Green Data Center use?
We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.
How close is SU Green Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is OCRRA (115 kV), about 800 m away. The local utility is Niagara Mohawk Power Corp., in the NYIS balancing area.
How clean is the power for SU Green Data Center?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates SU Green Data Center?
Syracuse University.
Data centers near Onondaga
- Northland Communications - Syracuse 4.6 km
- Lightboard ⭑ New York 5.1 km
- Greenidge Power Plant and Data Center 77.3 km · 20 MW
- Westelcom Networks Watertown 108.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.