QTS Richmond 3

QTS Richmond 3 is an operational data center that is still expanding, in Sandston, United States. Its power is about 202 MW, growing to about 336 MW by 2027-02. Epoch AI estimates about 175,000 H100-equivalent AI chips.

Power demand is growing at this site

Key facts

StatusOperational, expanding
Facility power202 MW
Reported (Epoch AI or owner data)
IT power144 MW
Planned power336 MW by 2027-02-13
Epoch AI timeline projection.
AI compute175,000 H100-equivalents → 291,000 planned
GPU capacity if all AIabout 80,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 5.5 billion → 9.1 billion planned
Epoch AI estimate, 2025 USD.
Energy partnersDominion Energy
Address3525–3543 Portugee Rd, Sandston, VA 23150
Coordinates37.52348, -77.31581 (city level)

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-04-0100Land clearing begins.
2025-02-0400Building 1 shell is mostly complete, with some chillers installed on the roof. Building 2 shell is under construction.
2025-11-1900The substation is still under construction, based on a [Google Earth image](https://earth.google.com/web/@37.48033002,-77.25002949,65.53442036a,2152.9927926d,30.00094375y,-0.00000001h,0.59169466t,0r/data=CgwqBggBEgAYAUICCAEyKQonCiUKITFZU1hJZlBmRzJ1dUxibWdQOTJzY05sTVB6cXVUZFVXZyABOgMKATBCAggASggIw4mB_QIQAQ), so we don't think any buildings are operational yet.
2025-12-3100The substation looks complete, but we expect Building 1 still needs commissioning before it is fully operational.
2026-02-1367 MW58,000Building 1 is operational, based on the substation being completed earlier and cars in the carpark. Building 2 and 3 are not operational, based on minor construction work at the perimeter and no cars in the carpark, but we expect they will be operational within 3 months. Building 4 has complete chillers and backup generators, while Building 5 has chillers but only a few backup generators - roughly the state of Building 1 on 2025-02-04.
2026-05-14202 MW175,000Building 2 and 3 are operational, based on the previous entry.
2027-02-13 (projected)336 MW291,000Building 4 and 5 are operational, based on Building 5 being roughly 1 year behind Building 1 in satellite imagery.

Source: Epoch AI Frontier Data Centers.

Satellite view

Questions

How much power does QTS Richmond 3 use?

Public data puts the facility power at about 202 MW, with about 336 MW planned by 2027. Reported (Epoch AI or owner data).