QTS Richmond 3
QTS Richmond 3 is an operational data center that is still expanding, in Sandston, United States. Its power is about 202 MW, growing to about 336 MW by 2027-02. Epoch AI estimates about 175,000 H100-equivalent AI chips.
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Facility power | 202 MW Reported (Epoch AI or owner data) |
| IT power | 144 MW |
| Planned power | 336 MW by 2027-02-13 Epoch AI timeline projection. |
| AI compute | 175,000 H100-equivalents → 291,000 planned |
| GPU capacity if all AI | about 80,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 5.5 billion → 9.1 billion planned Epoch AI estimate, 2025 USD. |
| Energy partners | Dominion Energy |
| Address | 3525–3543 Portugee Rd, Sandston, VA 23150 |
| Coordinates | 37.52348, -77.31581 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-04-01 | 0 | 0 | Land clearing begins. |
| 2025-02-04 | 0 | 0 | Building 1 shell is mostly complete, with some chillers installed on the roof. Building 2 shell is under construction. |
| 2025-11-19 | 0 | 0 | The substation is still under construction, based on a [Google Earth image](https://earth.google.com/web/@37.48033002,-77.25002949,65.53442036a,2152.9927926d,30.00094375y,-0.00000001h,0.59169466t,0r/data=CgwqBggBEgAYAUICCAEyKQonCiUKITFZU1hJZlBmRzJ1dUxibWdQOTJzY05sTVB6cXVUZFVXZyABOgMKATBCAggASggIw4mB_QIQAQ), so we don't think any buildings are operational yet. |
| 2025-12-31 | 0 | 0 | The substation looks complete, but we expect Building 1 still needs commissioning before it is fully operational. |
| 2026-02-13 | 67 MW | 58,000 | Building 1 is operational, based on the substation being completed earlier and cars in the carpark. Building 2 and 3 are not operational, based on minor construction work at the perimeter and no cars in the carpark, but we expect they will be operational within 3 months. Building 4 has complete chillers and backup generators, while Building 5 has chillers but only a few backup generators - roughly the state of Building 1 on 2025-02-04. |
| 2026-05-14 | 202 MW | 175,000 | Building 2 and 3 are operational, based on the previous entry. |
| 2027-02-13 (projected) | 336 MW | 291,000 | Building 4 and 5 are operational, based on Building 5 being roughly 1 year behind Building 1 in satellite imagery. |
Source: Epoch AI Frontier Data Centers.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS Richmond 3 use?
Public data puts the facility power at about 202 MW, with about 336 MW planned by 2027. Reported (Epoch AI or owner data).
Data centers near Sandston
- QTS Richmond 2 0 m · 252 MW
- QTS Richmond - (RIC5) 5.4 km
- White Oak Technology Park 2 5.7 km · 15 MW
- QTS Richmond 1 7.2 km · 333 MW
- DC5 7.3 km · 57 MW
- RIC1 DC3 7.4 km
- QTS Richmond (RIC1) 7.4 km
- QTS Richmond 3 Data Center 7.5 km · 76 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.