White Oak Technology Park 2
White Oak Technology Park 2 is an operational data center operated by QTS in Sandston, United States. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | QTS |
| Facility power | 15 MW (range 6.2 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 128,794 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 37.50619, -77.25496 |
Power and grid
| Nearest high-voltage substation | White Oak Substation, 230 kV, 2.3 km away (Dominion Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Virginia Natural Gas Co, intrastate pipeline, 500 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.5 GW in 28 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.4 °C (2001 to 2025) |
| Cooling degree days | 924 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.27 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does White Oak Technology Park 2 use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
How close is White Oak Technology Park 2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is White Oak Substation (230 kV), about 2.3 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for White Oak Technology Park 2?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates White Oak Technology Park 2?
QTS.
Data centers near Sandston
- QTS Richmond - (RIC5) 679 m
- Bank of America Data Center 1.9 km · 38 MW
- Iron Mountain data center in Sandston 2.0 km · 41 MW
- QTS Richmond 1 2.0 km · 333 MW
- RIC1 DC3 2.2 km
- QTS Richmond (RIC1) 2.2 km
- DC5 2.4 km · 57 MW
- RIC2 DC2 2.5 km · 50 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.